TR4 SLEX EXTENSION TIAONG INTERCHANGE 55% COMPLETE

TR4 SLEX EXTENSION TIAONG INTERCHANGE 55% COMPLETE


By Glen S. Ramos

TIAONG, Quezon – The South Luzon Expressway (SLEX) Toll Road 4 (TR-4) Extension located here in the province of Quezon is now 55 percent complete the Department of Public Works and Highways (DPWH). said over the weekend.

The 66.74-kilometer addition to the existing South Luzon Expressway (Metro Manila to Batangas) which brings the entire length of SLEX to 116.3 kilometers, will exceed the entire distance of SCTEX (Subic-Clark-Tarlac Expressway).

DPWH said the first 20km stretch of the TR4 Extension will be operational this year. (ai/mtvn)

Leave a Reply